
Kete 10kv Type S20 Oil-Immersed Transformer, Core | RFQ Sourcing Details
Transformers And Substation Equipment · Quote on request
This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.
Product specs
Buyer's Digest
Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Transformers And Substation Equipment. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.
Original product description
. Overview . Specification Company Profile Factory & workshop Product series After Sales Service FAQ Overview .
Cooling Method Oil-immersed Type Transformer Winding Type Multi-winding Transformer Certification ISO , ISO9001, CCC, CE,Gsa,Coc,GOST Usage Single-phase Transformer, Rectifier Transformer, Combined Transformer, Power Transformer, Distribution Transformer Frequency Characteristics Low Frequency Shape of Core EE Brand Kete Core Material Silicon Steel Sheet Winding Material Copper/Aluminum Taping Range ±2*2.5% Voltage Regulator 5 Steps Standard IEC60076, GB1094 Insulation Class a Frequency 50.
Hz/60.
Hz Coil Structure Toroidal Connection Yyn0 or Dyn11 Outline Shape Vertical Transformer Moisture-Proof Method Sealed High Voltage 10kv Low Voltage 0.4kv Capacity 630kVA 800kVA 1000kVA Transport Package Export Standard Wooden Box Specification Customized Trademark KETE Origin Liaocheng, Shandong Province, China HS Code Production Capacity 5000 Pieces/Year .
Product Introduction Kete oil-immersed 3D wound core transformer is an energy-efficient power transformer, featuring a 3D wound core structure and using oil as the cooling and insulating medium.
Product Advantages 1.High Efficiency & Energy Saving: 3-phase wound core ensures even magnetic circuit, cutting traditional laminated core joint loss. No-load/load loss is significantly reduced, with energy efficiency up to S20 standard and above.
2.Low-Noise Operation: Fewer wound core joints and lower magnetic resistance minimize operational vibration/noise, ideal for noise-sensitive areas (residentials, hospitals, schools).
3.Superior Heat Dissipation: Mineral oil as cooling medium effectively lowers operating temperature, supporting long-term high-load use and extending equipment life.
4.Strong Short-Circuit Resistance: Stable wound core structure, rational winding design, and mostly circular core cross-section (good fastening) enable it to withstand large short-circuit current impacts.
5.Compact Structure: 3D wound core design reduces size/weight, easing transportation/installation and saving space—perfect for limited-space scenarios.
Operating Conditions Ambient Temperature: Maximum: +40℃;Minimum: -25℃ (Wider temperature ranges available) Relative Humidity: ≤90% (Higher protection levels available) Altitude: ≤1000m (Special designs for higher altitudes available) Scope of Application It is widely applied in core fields including: power transmission and distribution within power systems, new energy power generation (e.g., wind power, PV), self-owned power supply for industrial enterprises, and various infrastructure construction projects (e.g., transportation, construction-related supporting power needs).
Specification Rated Capacity H.V. L.V. Connection symbol No-load loss(w) On-load loss(w) Short circuit impedance S22 S22 S22 S Dyn11 Yyn0 65 455/ / / / / / / / / / / / Company Profile Founded in 1996 in Liaocheng, China, Liaocheng Kete New Energy Co., Ltd.
has a registered capital of RMB 110 million, covering 260,000m² (building area: 67,000 m²) and holding the title of National High-Tech Enterprise.
We specialize in manufacturing power equipment (distribution transformers, box-type substations, high/low-voltage switchgear, transmission line towers, new energy tech & equipment) and hold Grade-4 Qualification for 110kV-and-below Electric Power Construction, Testing & Maintenance.
We have developed into an integrated base for R&D, design, production and construction via tech innovation. Certified with ISO 9001, ISO 14001, OHSAS 18001 and CCC (for 18 low-voltage products), our products have passed CQC inspections.
They serve urban power grids, power plants, substations, oil/chemical, railway and construction sectors, and are exported to the US, Brazil, Peru, Kenya, Ethiopia, India, Myanmar, Vietnam, etc. We sincerely welcome partners from home and abroad to explore cooperation opportunities and pursue mutual development with us.
Factory & workshop Product series Dry type transformer Oil immersed transformer Prefabricated substation Pad mounted transformer High-voltage switchgear Pole mounted transformer After Sales Service 1.Our company's warranty coverage includes performance failures caused by material defects or manufacturing process issues, such as cabinet water leakage, insulation failure, abnormal switch operation, etc.
2.We provide spare parts for maintenance free of charge, and will dispatch technical personnel for on-site inspection and repair if necessary, with travel expenses borne by the supplier. 3.If the customer needs to purchase spare parts from our company, the goods can generally be shipped within 2-7 days.
4.24/7 technical support hotline, ensuring a fault time of ≤ 2 hours. 5.During the warranty period, regular return visits (once every 3 months) will be conducted to provide operation status testing and maintenance recommendations.
6.After the warranty period expires, lifelong maintenance services at cost price and spare parts supply can be provided. 7.The warranty period for our products is one year. If an extension of the warranty period is required, we will increase the price by a certain profit margin based on the existing price accordingly.
FAQ 1.Will Kete provide guidance documents for installation? For large transformers that require the removal of some accessories to fit into containers, we will provide an installation video and an electronic version of the installation instructions.
2.What is the manufacturing and delivery lead time for Kete oil-immersed transformers? Generally speaking, if the customer provides detailed design drawings and specification requirements, transformers below 2500KVA can be completed within approxima;transformers above 2500KVA usually take about 30 to 40 days.
The specific lead time depends on the complexity of the transformer. 3.What is the packaging for Kete oil-immersed transformers? For bulk cargo, we will use wooden cases for packaging;for full containers, we will use wooden pallets to reinforce the packaging.
If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters. 4.What are the payment terms for Kete transfor
Kete | Applications and Buyer Notes
Kete is organized as a sourcing-ready Transformers And Substation Equipment reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and
Applications
- Initial shortlist building for related product or supplier options.
- Specification and application fit review before bulk purchasing.
- Category, keyword and detail-page comparison before sending an RFQ.
Key specifications
- Category
- Transformers and Substation EquipmentBased on visible page data; confirm exact value in the RFQ.
- Unit
- setBased on visible page data; confirm exact value in the RFQ.
- 30
- Dyn11 Yyn0 65 455/430 4Based on visible page data; confirm exact value in the RFQ.
- 50
- 80 655/625Based on visible page data; confirm exact value in the RFQ.
- 63
- 90 785/745Based on visible page data; confirm exact value in the RFQ.
- 80
- 105 945/900Based on visible page data; confirm exact value in the RFQ.
- 100
- 120 1140/1080Based on visible page data; confirm exact value in the RFQ.
- 125
- 135 1360/1295Based on visible page data; confirm exact value in the RFQ.
Buyer tips
- State quantity range and split-delivery needs before price comparison.
- Add certification, material or inspection standards when they affect acceptance.
- For time-sensitive projects, include target arrival date and destination.
- For special applications, describe operating condition, installation environment and duty cycle.
FAQ
What should buyers confirm first?
Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.
Can buyers inquire when specs are incomplete?
Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.
How should this listing be evaluated?
Check title, category, specifications and related keywords against the actual sourcing requirement.
Source mix: ugc
Key specifications
Product sourcing keywords
These terms come from the title, visible copy and specifications, and link into matching aggregate pages.
Continue from this detail page into sourcing structure
These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.
This URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path Product CategoryThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path 0 03 10mva Capacity 11 35kv Epoxy Resin Cast Dry Type TransformerThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path Meters And Protection Devices categoryThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path Cables Busbar And Accessories categoryThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path Switchgear And Breakers categoryThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path Transformers And Substation Equipment categoryThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path CompanyThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path 0 2 Accuracy Micro Low Oval Gear Flow Measurement Sensor MeterThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path 0 25mm 0 26mm 0 27mm G657a2 G657a1 G652d Single Mode Fiber For Drone Fpv Video And Aerial Network DaThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path 0 25mm 0 27mm Ultra Light G657a2 Fiber Optic 5km 10km 20km 30km 50km 0 27mm Anti Interference Fpv DrThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path 11kv Distribution Transformers sourcing pathThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path Ip65 Switchgear Panels sourcing pathThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
Internal sourcing path Electrical Equipment Exporters sourcing pathThis URL was refreshed but still has no Googlebot evidence, so it is promoted into shared internal links for crawl discovery.
PowerGridSource related sourcing paths
Medium Voltage Distribution Projects
PowerGridSource procurement phrases
PowerGridSource related product samples
We also undertake factory and manufacturing contracts as well as works contracts, ensuring customized and reliable solut...
Transformers and Substation Equipment Hot Selling Galvanized Material Silicone Rubber Transmission Line Substation Power Plant Disconnecto. Overview Production Scenario Testing Equipment And Reports Packaging & Shipping Engineering Case Cooperative Partner W...
Transformers and Substation Equipment Bypass Disconnect Outdoor High Voltage Isolation Switch Group Isolator Switch Air Disconnect Switch. Overview Production Scenario Testing Equipment And Reports Packaging & Shipping Engineering Case Cooperative Partner W...
Transformers and Substation Equipment Zw30 Column Switch Customized Epoxy Resin Transformer Inlet Outlet Bushing. Overview Production Scenario Testing Equipment And Reports Packaging & Shipping Engineering Case Cooperative Partner W...
Transformers and Substation Equipment DIN 42530 Low Voltage Ceramic Porcelain Transformer Insulating Bushing. Overview Production Scenario Testing Equipment And Reports Packaging & Shipping Engineering Case Cooperative Partner W...
Transformers and Substation Equipment Gw7 Outdoor Three Phase 3 Pole 66kv 72.5kv Double Side Breaking Disconnector Switch. Overview Production Scenario Testing Equipment And Reports Packaging & Shipping Engineering Case Cooperative Partner W...





