PowerGridSourceSwitchgear, transformers, breakers, metering devices, and power distribution components for global buyers.
New Fire Alarm Control Panel Fire Alarm System 1-10 Zones Control Panel 2 Zones
Transformers And Substation Equipment

New Fire Alarm Control Panel Fire Alarm System 1- | RFQ Sourcing Details

Transformers And Substation Equipment · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryAlarm Panels
Unitset
poweroutput. Non-resettable
specificationAC
CategoryTransformers And Substation Equipment
CategoryTransformers And Substation Equipment
AvailabilityInquiry required
Updated2026-05-27

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Transformers And Substation Equipment. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Factory Fire Alarm Control Panel for Building Project Fire alarm control panel The SR-P02 Series Conventional Fire Alarm Control Panel is a 24 volt, one to ten-zone, Class B, Conventional Fire Alarm Control Panel.

Designed exclusively to meet the latest market requirements and future ULC codes, the highly cost-effective SR-P01 Series can be used in a variety of low- to mid-sized applications.

Main Features: Four, Eight, Sixteen Zone Style B (Class B) Initiating Device Circuits (IDCs), All zones accept two-wire smoke detectors and any normally-open . Two Supervisory Input with DC12V output, ideal to connect security alarm devices. Three General Alarm, Trouble and Supervisory, Form A Relay Output.

One, Two, Four Built-in Sound Output, Style Y (Class B) Notification Appliance (Signal) Circuits (NACs), NACs may be programmed: Silenceable or Non-Silenceable. 3.0 amps of total system power. Resettable DC24V & Non-resettable DC24V Output. Zone Input Short Circuit can be set to "Alarm" or " Fault" mode.

RS485 Communication Port (optional). Automatic/Manual mode can be programmed. Disable/Enable control per Zone (IDC) can be programmed. Disable/Enable Sound Output(NACs) can be programmed. Technical specification: AC POWER: 220VAC, 50 Hz. BATTERY: Sealed lead-acid batteries only.

Maximum charging circuit: 27.6VDC @ 0.8 amp for normal flat charge. Maximum battery charger capacity: 18AH battery. NOTE: Two 10AH batteries can be housed in the cabinet. Larger batteries require a separate battery box. Total DC24V system power: 3.0 amps. Maximum current per NAC: 1.25 amps.

Maximum battery charging capability: 18 AH. Resettable four-wire smoke detector power output. Non-resettable power output. Integral Form-A Alarm, Trouble and Supervisory relays, rated at: 2.0 amps @ 30 VDC (resistive), 2.0 amps @ 30 VAC (resistive) Product Pictures

New | Applications and Buyer Notes

New is organized as a sourcing-ready Transformers And Substation Equipment reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and l

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Transformers And Substation EquipmentBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.
power
output. Non-resettableBased on visible page data; confirm exact value in the RFQ.
specification
ACBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryAlarm Panels
Unitset
poweroutput. Non-resettable
specificationAC

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

PowerGridSource related sourcing paths

PowerGridSource procurement phrases

PowerGridSource related product samples