PowerGridSourceSwitchgear, transformers, breakers, metering devices, and power distribution components for global buyers.
Vlf AC Hipot Tester 80kv Cable Withstand Voltage Testing AC Power Frequency Testers
Grounding Cables

Vlf AC Hipot Tester 80kv Cable Withstand Voltage | RFQ Sourcing Details

Grounding Cables · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryGrounding Cables
Unitset
CategoryGrounding Cables
AvailabilityInquiry required
Updated2026-05-26

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Grounding Cables. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Product parameters Product Name Ultra Low Frequency High Voltage Generator Rated voltage 30 k V, 40 k V, 50 k V, 60 k V, 80 k V, 90 k V, etc Measurement accuracy 3% Voltage waveform distortion ≤ 5% Voltage positive and negative peak error ≤ 3% Output frequency 0.1. Hz, 0.05. Hz, 0.02.

Hz Product Features ★Current, voltage, and waveform data are directly obtained through high-voltage side sampling, so the data is true and accurate ★ Overvoltage protection: When the output exceeds the set voltage limit, the instrument will shut down for protection, with an action time of less than 20 milliseconds ★ Overcurrent protection: designed as a dual protection of high and low voltage, the high voltage side can be precisely shut down for protection according to the set value;When the current on the low-voltage side exceeds the rated current, shutdown protection will be implemented ★The high-voltage output protection resistor is designed inside the boost, so there is no need to connect another protection resistor externally ★For products with a voltage of over 50kv, the series combination method can achieve multiple uses for one machine, making it extremely convenient to use ★Due to the use of high and low voltage closed-loop negative feedback control circuit, there is no capacitance rise effect in the output ★Measurement accuracy: 2% ★Voltage positive and negative peak error: ≤ 3% ★Voltage waveform distortion: ≤ 5% ★Output frequency: 0.1.

Hz, 0.05. Hz, 0.02. Hz ★Power supply: AC 50. Hz, 220V ± 5% (generator: AC 50. Hz, 220V ± 5%) ★Test time: Handover: 60 minutes ★Prevention: 5 minutes (can run for a long time) Model no Output Voltage/ Current (Peak) Load Capacity Control Unit Booster (Tank) Power Capacitan c e / Freuency Net Dim.

(cm) Net Wt (kg) Net Dim. (cm) Net Wt (kg) KDVLF- 4 0 4 0kV/ 2 0 mA 0.1. Hz-0.01. Hz Auto Variable Capacity : ≤10 µF 40 × 31 × 20 6 29x 1 5 × W KDVLF-5 0 50kV/2 0 mA 0.1. Hz-0.01. Hz Auto Variable Capacity : ≤10 µF 40 × 31 × 20 6 29x 1 5 × W KDVLF-6 0 60kV/59 mA 0.1. Hz-0.01.

Hz Auto Variable Capacity : ≤ 5 µF at 60 k V;40 × 31 × 20 6 4 5 × 19 × W KDVLF-8 0 80kV/59 mA 0.1. Hz-0.01. Hz Auto Variable Capacity : ≤ 5 µF at 80 k V;Capacity : ≤ 10 µF for single booster (40/40 k V) 40 × 31 × 20 6 29x 1 5 × W 36x19 × 45 45 KDVLF-9 0 90kV/59 mA 0.1. Hz-0.01.

Hz Auto Variable Capacity : ≤ 5 µF at 90 k V;Capacity : ≤ 10 µ F for single boo

Vlf | Applications and Buyer Notes

Vlf is organized as a sourcing-ready Grounding Cables reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time questions be

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Grounding CablesBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryGrounding Cables
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

PowerGridSource related sourcing paths

Related applications PowerGridSource related paths

Industrial Power Distribution

Renewable Integration and Storage

Related solutions PowerGridSource related paths

Energy Metering and Protection Upgrades

Medium Voltage Distribution Projects

PowerGridSource procurement phrases

PowerGridSource related product samples